The Paddocks was
developed with the long-term goal of conjunctive wetland
treatment and ASR of stormwater using a confined limestone
aquifer. Injection in the 170m deep well at this site is
under pressure because of the low hydraulic conductivities.
-
Urban
stormwater management
-
Conjunctive
wetland treatment
-
Improvements
to local recreational facilities through the
establishment of landscaped parks and gardens
-
Savings of
$20 000 per year to local council on irrigation costs
-
Site has
been operational since 1996 and stores between 80–100 ML
each winter for summer irrigation
-
The
Challenges:
-
Low
hydraulic conductivities at the selected site
-
Efficiency
of wetland treatments to achieve desired water quality